GS-III · UPSC Mains PYQEconomic Development 2013 10 Marks
Adaptation of PPP model for infrastructure development of the country has not been free from criticism. Critically discuss the pros and cons of the model.
Microtheme: PPP X Infrastructure · Asked in UPSC Civil Services Mains Examination 2013.
Model Answer Approach
- Decode demand: Identify the directive verb (discuss / examine / critically analyse) and bound the scope to PPP X Infrastructure.
- Intro (40–50 words): Define the core concept; anchor with a definition, data point, or constitutional/historical reference.
- Body: 2–3 thematic sub-heads with crisp points, examples and counter-arguments. Add a relevant case study or committee/report.
- Conclusion (30–40 words): Forward-looking — recommendations, way forward, or a constitutional/ethical anchor.
Structure Checklist
- ✓ Definition / context in intro
- ✓ Minimum 1 data point or report
- ✓ Multi-dimensional arguments
- ✓ Counter-view / limitations
- ✓ Diagram, flowchart or map (if applicable)
- ✓ Way forward in conclusion
Keywords to Use
adaptationinfrastructuredevelopmentcountrycriticismcriticallydiscuss
Related UPSC Mains Questions
From the same microtheme — PPP X Infrastructure.
- Why is Public Private Partnership (PPP) required in infrastructural projects ? Examine the role of PPP model in the redevelopment of Railway Stations in India.📅 2022 · 📌 10
- Examine the developments of Airports in India through Joint Ventures under Pub- lic-Private Partnership(PPP) model. What are the challenges faced by the authorities in this regard.📅 2017 · 📌 10
- Explain how private public partnership agreements, in longer gestation infrastruc- ture projects, can transfer unsuitable liabilities to the future. What arrangements need to be put in place to ensure that successive generations’ capacities are not compromised?📅 2014 · 📌 12.5
